You don't have javascript enabled. Good luck with that.
Pencarian
MRT Jakarta Berlakukan Kapasitas Tempat Duduk Penumpang 100 Persen

MRT Jakarta Again Applies 100 Percent Passenger Seating Capacity

PT MRT Jakarta has implemented a 100 percent passenger seating capacity policy starting Monday (3/14).

We set a capacity of 516 people per car

Currently, the distancing sign on the seats in the MRT transportation mode has been removed and can be occupied by passengers.

This policy complies with Jakarta Transportation Agency (Dishub) Head's Decree number 145/2022 on PPKM Level 2 and Transportation Ministry Circular Letter number 25/2022 on the regulation of maximum 100 percent passenger capacity for mass transportation modes located in areas with status PPKM Level 2.

MRT and LRT Adjust Operating Hours during PPKM Level 2

PT MRT Jakarta Corporate Secretary Division Head Rendi Alhial said the maximum passenger capacity of the MRT Jakarta is currently 86 people per train.

"We set a capacity of 516 people per car," he stated, Monday (3/14).

Indonesia’s first mass rapid transit service will operate between 5 AM - 9.30 PM on weekdays and between 6 AM - 9.30 PM on the weekend.

As for the headway between trains on weekdays is set at five minutes during peak hours between 7 AM to 9 AM and 5 PM to 7 PM.

"Then the headway outside peak hours is every 10 minutes and on weekends or holidays," he explained.

The operator would still enforce the rules of social distancing in the train by keeping a distance sign, such as body temperature checks, the requirement to wear a face mask, and educating passengers on maintaining a physical distance.

"Including regularly washing hands or engaging in conversation on the train and station platforms," he closed.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1709 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1481 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1335 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1120 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye815 personDessy Suciati